week FOUR, group FOUR - FIRM [grasp]

Home Streeeeetttchhh!

During week 4 the pressure of the up coming due date set in. We pushed to finalize our floorplan as well as complete schematic sketches for the spaces to be developed, i.e. the lobby, the library, the locker rooms, and in our case the pool area. The architects worked hard to complete the basic form and details of the exterior. The interior designers collaborated with the architects to integrate the forms and materials of the exterior and relate them in the interior. Also we worked together to decide on materials and a color scheme.

As far as our goals for this coming week... we want to finish all of the presentation documents that are required. With this major feat complete we hope to have plenty of time to compile our construction documents, FF&E board, and "hopefully" so extras!!!

A lot of progress was made this week, and with progress comes feedback. As we develop our spaces further this week we will challenge ourselves to incorporate aspects of total design that have been suggested to us. We will be attempting to create levels of interest within our spaces with lighting, ceiling height changes, artwork, various sizes of furniture, and flooring changes. With a focus on the concept of “merging” traditional and contemporary aspects we will be merging colors, textures, and materials to create a energetic and comfortable atmosphere within the wellness center.

0 Responses to “week FOUR, group FOUR - FIRM [grasp]”:

Leave a comment