Week four consisted of a team effort to complete the floor plans as well as solve problems within the building such as square footage and code requirements. As a group, we made great progress on construction documents such as dimensioned floor plans and began furniture plans. Materials were selected for certain areas on the interior. The design is finalized and is now in the process of putting together final documents for presentations.


Goals we met:

Floor plan completion

Interior square footages resolved

Fixed storage shortage problem

Solved drainage problem with connected building

Goals for the following week:

Have all rendered drawings completed


Print floor plans and fix any last minute problems

Prepare presentation


The group worked diligently together to figure out the complex puzzle of square footages on the floor plan. Both architects and Interior designers incorporated their ideas into the plans. Working on a shared file, each member added his/her idea for a specific space of the building, resulting in a finished floor plan for both first and second story.

0 Responses to “ ”:

Leave a comment