For week three we were assigned the task of finalized of floor plan with mixed of concept ideas and designs.








The image to the left is a finial two bubble diagram we will put together in to the floor plan. the bottom show more details of space planning.










This image to the right is one of the floor plan / site planning we came up with. egress, occupancy and way-finding are most important elements for the wellness center.









The image on the right is other schismatic design floor plan. we decide to have the building entrance in both east and west for easy circulation, egress and drop off for quick access to any part of the building.
























This is the finalized floor plan we developed. we work as a team, combining most those concept ideas to a next phase of designing process. The wellness center connected from the OKCCC building, design group want the center to have its own characteristic but also part of the collage.

Goals; we hope after our critique to have a good understanding of what needs to change with our overall design. We will finalized the floor plan , hope to have some 3d model or perspective images will show better understanding other space.